Focus on: South Korea

Market overview

Prepared by Norton Rose Fulbright in collaboration with Lee & Ko

South Korea’s nascent offshore wind market has made strong advances in the last few years. The first commercial scale offshore wind farms have come online and several GWs of projects, both fixed and floating, are in various stages of development and construction.

The share of renewable energy in South Korea’s electricity generation mix reached 9.64 per cent in 2023. The government plans to increase the share of renewables significantly, with a target of 20% renewable energy by 20301.

On 21 February 2025 the General Committee on the Basic Plan on Electricity Supply and Demand finalised the 11th Basic Plan on Electricity Supply and Demand (the 11th Basic Plan) that provides a blueprint for electricity demand and supply out to 2038. The 11th Basic Plan projects that renewable energy’s share of total energy generation will amount to 21.6 per cent by 2030 and 32.9 per cent by 2038. As part of a 2025 governmental reorganisation, energy-policy functions were transferred from the Ministry of Trade, Industry and Energy (MOTIE) to the newly established Ministry of Climate, Energy and Environment (MCEE). For ease of reference, this report refers to MOTIE when discussing measures adopted before that reorganisation and to MCEE when referring to subsequent measures. In December 2025, MCEE announced an updated implementation plan which broadly endorses the 11th Basic Plan’s long-term offshore wind targets but refines the interim deployment trajectory, focusing on achieving around 10.5 GW of installed or committed capacity by 2030 and 25 GW by 2035. In light of current grid and infrastructure constraints, it is anticipated that roll-out of this capacity will occur at a pace of approximately 4 GW per year.

The Renewable Portfolio Standard (RPS) provides key support (replacing the previous FIT system in 2012) by requiring the country’s largest power generators (i.e. those with installed power generation capacity of over 500 MW) to progressively increase, on a yearly basis, the proportion of their power that is produced using renewable energy. Direct investment in a renewable generation asset is not the only way to meet RPS targets; generators can purchase renewable energy certificates (RECs) from renewable energy producers in order to satisfy their RPS obligations. The sale of these certificates creates revenue streams for renewable energy producers that complement the revenue received from the conventional sale of electricity. In May 2024, MOTIE announced its “Strategy for Expanding Renewable Energy Deployment and Strengthening Supply Chains”, outlining significant reforms to the RPS framework, introducing a competitive bidding process for facility capacity and establishing long term fixed price contracts between electricity suppliers and renewable energy generators. These policy directions have since been reflected in a bill submitted to the National Assembly in January 2026 (the “RPS Reform Bill”), which, if enacted, would introduce a transition toward a government-led contract market, including auction-based procurement and long-term contracting structures, as discussed further below.

South Korea: offshore wind projects

Publicly available sources indicate that (as of September 2025) a number of offshore wind projects had been awarded an electric business licence, with a combined planned capacity of 28 GW. We have set out details of some of those projects.

Project name MW Status Ownership
1. Gunsan Port 3 Operational KEPCO
2. Yeonggwang Yaksu 4.3 Operational Jeonnam Development Corporation (JNDC)
3. Woljeong 5 Operational Korea Institute of Energy Research (KIER)
4. Southwest Phase 1 60 Operational Korea Hydro and Nuclear Power Co., Ltd. (KHNP), Korea East-West Power Co., Ltd (EWP), Korea South East Power Co., Ltd (KOEN), Korea Southern Power Co. Ltd. (KOSPO), Korea Western Power Co Ltd (KOWEPO), Korea Midland Power (KOMIPO), Korea Offshore Wind (KOWP) and Korea Electric Power Corporation (KEPCO)
5. Yeonggwang Gun 34.5 Operational EWP, Daehan Green Power and Unison
6. Tamra 30 Operational Doosan Enerbility Co., Ltd., NongHyup Bank, KOEN
7. Jeonnam 1, 2 and 3 897 Phase 1: Operational
Phases 2 and 3: Development
SK E&S and Copenhagen Infrastructure Partners
8. Halim 100 Construction KEPCO, Hyundai Engineering & Construction, KB Kookmin Bank, Baram Corp., KOMIPO
9. Sinan Government Project 4,100
2,100
2,000
Development
(in phases)
KHNP, KOEN, KOMIPO, KOSPO, KOWEPO, KOWP, EWP, KEPCO
10. Ansan Pungdo 200 Development KOWEPO, Seohae Green Power and Wooram Construction
11. Anma 532 Development - 2024 auction award JNDC, Korea Wind Corporation Co., Ltd., KHNP, Hyundai Engineering and Construction, Equis Development Pte. Ltd.
12. Gochang 76.2

Development -

2023 auction award

Dongchon Wind Power, KOMIPO and Hyundai Engineering
13. Yeonggwang Nakwol 364.8

Development

2023 auction award

Myoungwoon Industrial Development and B.Grimm Power Public Co
14. Yeonggwang Chilsan 151.2 Development CW NR Co. Ltd
15. Yeonggwang Yawol 108 Development - 2024 auction award Daehan Green Power Corporation
16. Yeonggwang Hanbit 344 Development B.Grimm Power Public Co and local partner
17. Shinan Eoui 99 Development Shinan-Eoui Wind Co., Ltd. And B.Grimm Power Public Co
18. Abhae 84.5 Development - 2025 auction award Woori Green Energy Co LTD
19. Jeonnam Sinan 300 Development Posco Energy and KOSEP
20. Haewoori (floating) 1,500 Development Copenhagen Infrastructure Partners
21. Shinan UI 390 Development - 2023 auction award Hanwha Engineering & Construction, KOEN and SK D&D
22. Wando Geumil 1 and 2 600 Development - 2023 auction award KOEN
23. Wando 148.5 Development KOEN
24. Cheongsapo 40 Development G Wind Sky, Hanwha Investment and Securities and Corio Generation
25. Dadaepo 60 Development - 2025 auction award Corio Generation
26. Gijang 200 Development Corio Generation
27. Ulsan 136 Development SK Ecoplant
28. Handong-Pyeongdae 105 Development - 2025 auction award Jeju Energy Corporation
29. Ulsan City 6,100 Development Ulsan City in collaboration with state-owned enterprises and commercial developers
30. South West 2,700 Development - 2025 auction award KEPCO
31. Jindo
(MyeongRyang, Manho and Jindo Baram)
420
990
1,800
Development HD Hyundai Electric, Pacifico Energy Korea, CS Wind, Korea Ocean Engineering & Consultants and Daebul Shipbuilding
32. Seohae 495 Development RWE
33. Neulsaem Ui 510 Development RWE
34. Hanee Baram 2,000 Development RWE
35. Incheon 1,600 Development Ørsted
36. Gray Whale (floating) 1,500 Development Corio Generation, TotalEnergies and SK Ecoplant
37. Maenggoldo 600 Development Corio Generation, TotalEnergies and SK Ecoplant
38. Geomundo 500 Development Corio Generation, TotalEnergies and SK Ecoplant
39. Bandibuli (floating) 800 Development Equinor
40. Donghae 1 (floating) 200 Development Equinor, Korea National Oil Corporation and EWP
41. Haesong 1,000 Development Copenhagen Infrastructure Partners
42. MunmuBaram (floating) 750 Development Hexicon and Shell
43. Jodo 517 Development B.Grimm Power Public Co and Goni Jodo Co., Ltd.
44. Yokjido 1 360 Development KOMIPO and Vena Energy
45. Jindo 855 Development Influx Inc.
46. Jindo 3,200 Development Pacifico Energy
47. KF Wind (floating) 750 Development Ocean Winds, Mainstream Renewable Power
48. Hanbandodado 1,245 Development Ocean Winds
49. Portfolio of 4 projects 6,000 Development Bp and Deep Wind Offshore
50. Dado 900 Development Northland Power
51. Bobae 600 Development Northland Power
52. Taean - Manipo Offshore Wind Farm 504 Development Vena Energy
53. West Sea Energy 1 1,500 Development EDF Renewables

South Korea: development process overview

The government in South Korea is taking an increasingly active role in facilitating the project development process.

In February 2025, the Special Act on the Promotion of Offshore Wind Power Distribution and Industrial Development (the OSW Promotion Act) was passed. Effective from 2026, the OSW Promotion Act is expected to streamline the site selection process and improve the permitting process by moving from a developer driven approach to a government-led zoning model. MCEE will designate certain power generation zones in which offshore wind projects will be permitted to be developed. This will be supported by a “one-stop shop” process which is intended to coordinate and streamline multi-agency permitting and reduce early-stage uncertainty. The regime will principally apply to new offshore wind projects. However, the OSW Promotion Act also includes transitional arrangements for certain existing projects. In particular, an existing project that has already obtained an electric business license may continue under the existing regime, but may also apply to be brought within the new framework; if the relevant designation criteria are met, the project may be treated as selected under the OSW Promotion Act and its existing site may be deemed to have been designated as a development zone, while projects that do not elect to transition will remain subject to the existing regulatory regime.

South Korea: auctions

An auction system for wind power projects has been in place in South Korea since 2022 when the New & Renewable Energy Center (NREC) of the Korea Energy Agency (KEA) amended the Rules on the Issuance of Supply Certificates and Operation of the Trading Market (the REC Rules). The awards entitle the winning bidders to a 20-year fixed price offtake contract for RECs (a REC Contract). The revenue for an operational project that has been awarded capacity in the auction, as recorded in a REC Contract, is the sum of the system marginal price (SMP) received through the sale of the electricity through the Korea Power Exchange (KPX) and the fixed price for the REC awarded through the auction (please refer to the "South Korea support regime" section below for more details regarding the SMP and REC valuation and weighting).

The first auction was announced in September 2022 with a ceiling price of $0.13/kWh. One offshore project was awarded capacity in this round; the 99 MW Jeonnam 1 developed by Copenhagen Infrastructure Partners and SK E&S.

The 2023 bid round focused on bid prices, with the ceiling price kept confidential. Bidders were required to have completed their EIAs before submitting bids. Five projects with a total capacity of 1,431 MW were awarded capacity in December 2023. The winning bidders were:

Project MW Ownership
Yeonggwang Nakwol 364.8 Myoungwoon Industrial Development and B.Grimm Power Public Co
Wando Geumil 1 and 2 600 KOEN
Shinan Ui 396 KOEN, Hanwha and SK D&D
Gochang 76.2 Dongchon Wind Power, KOMIPO and Hyundai Engineering

On 8 August 2024, MOTIE announced a roadmap for future offshore wind auctions, with 1.5GW of offshore wind capacity available in the first auction round. From 2025, MOTIE adjusted the auction cycle so that offshore wind bidding occurs twice a year. The first round occurs in the second quarter of each year. If capacity targets are not reached in the second quarter auction, an additional auction will be conducted in the fourth quarter.

The auctions now all include a two-stage evaluation process. Phase 1 involves an assessment of non-price factors, with the NREC's Wind Power Auction Committee selecting projects to proceed to Phase 2. Phase 2 is based on price, with the bidder achieving the highest combined score being awarded capacity.

While South Korea does not directly mandate local content, the bid evaluation criteria results in a 50-50 weighting between price and non-price factors, which include industrial economic effects (including consideration of safety and the public and contributions to the local supply chain), community acceptance, grid readiness and maintenance of the facilities.

In response to wider industry feedback, the Korea offshore wind roadmap also provided for the extension of the deadline for completion of the offshore wind farm project following entry into the REC Contract. The revised deadlines are as follows:

Offshore wind farm capacity COD Deadline
100 MW or less 54 to 60 months
100MW – 300MW 60 to 72 months
300MW + 60 to 78 months

It has also been confirmed that force majeure and grid delays (attributable to KEPCO) can be relied upon by projects to obtain further extensions to the COD Deadlines set out above.

The fourth wind auction, which occurred in the first half of 2025, was conducted in line with the government’s offshore wind roadmap. 1.25 GW was tendered across a general fixed-bottom tranche and a publicly-led tranche. No awards were made under the general tranche, however all 689 MW of publicly-led capacity was awarded to the following four projects, with each securing a 20-year REC contract:

Project MW Ownership
Southwest Offshore Wind Sibeom Danji Project (Fixed Bottom) 400 Korea Offshore Wind Power
Handong-Pyeongdae Offshore Wind (Fixed-Bottom) 110 Jeju Energy Corporation & EWP
Dadaepo 99 KOSPO & Corio Generation
Aphae Offshore Wind (Fixed-Bottom) 80 CGO, KEPCO & Hyundai E&C

For the 2026 H1 round, the ceiling prices were KRW 171,229/MWh for fixed-bottom offshore (mainland), KRW 171,205/MWh for fixed-bottom offshore (Jeju), KRW 175,100/MWh for floating offshore (mainland), and KRW 175,076/MWh for floating offshore (Jeju). The updated criteria also placed greater emphasis on project readiness, including evidence of port utilisation plans and contingency measures for port disruption.

The results of the 2026 H1 auction were announced in June 2026. A total of 1.786 GW of capacity was awarded across five projects, from bids representing 3.656 GW of capacity. The outcome of the H1 auction reflects the continued evolution of South Korea's offshore wind sector, with strong developer participation and an increasing focus on project readiness, supply chain considerations and cost competitiveness. The successful projects are:

Project MW Ownership
Gulupdo Offshore Wind (Fixed-Bottom) 250 DAEWOO E&C, C&I Leisure Industry, SK D&D
Hanbit Offshore Wind (Fixed-Bottom) 340 Myungwoon Industrial Development, B. Grimm Power
Haesong 3 Offshore Wind (Fixed-Bottom) 504 CIP
Haewoori 2 Floating Offshore Wind Project (Floating) 532 CIP
Geumodo Offshore Wind (Public-Led) 160 DL Energy, Korea Midland Power, KOMIPO

Source: Global Wind Energy Council, 2026

South Korea: support regime

1 Renewable Portfolio Standard (RPS)

The RPS requires all large power generating companies (i.e. those with an installed capacity of over 500 MW) to comply with yearly targets pertaining to the proportion of their total generated power produced by “new and renewable energy sources” (see table below).

2022 12.5%
2023 13%
2024 13.5%
2025 14%
2026 15%
2030 25%

The power generating companies can meet RPS targets by directly investing in the installation of renewable energy generating capacity or through the purchase of RECs (see below). If a company fails to meet its RPS targets, it will be liable to pay a penalty in an amount up to 150 per cent of the average REC price for its REC shortfall. Penalties vary depending on the nature of non-compliance (as well as the frequency).

MCEE is currently considering broader reforms to the RPS and REC framework. These proposals are also reflected in the RPS Reform Bill, which would introduce a transition from the current supply-obligation model toward a government-led contract market, under which deployment volumes would be determined through auction-style procurement and designated purchasers would enter into long-term purchase contracts with successful generators. The RPS Reform Bill also contemplates a transition away from the REC spot market by converting REC-type instruments into non-tradable generation information certificates used primarily for evidentiary and compliance purposes, although the precise transition mechanics remain subject to further legislative and subordinate-rule development.

2 Renewable Energy Certificate (REC)

One REC documents that 1 MWh has been generated by a certified eligible facility, however, different multipliers (i.e. weightings) are then applied to the output depending on a number of factors including the type of renewable energy used to produce that output. Offshore wind has a high weighting value compared to e.g. solar PV or onshore wind, demonstrating the government’s focus on this market. The NREC of the KEA has authority to issue RECs to certified eligible facilities. NREC will determine (upon inspection) whether a facility complies with the standards for the applicable renewable energy (upon application by the relevant renewable energy producer) and can therefore be certified and registered. Once this has occurred, the certified eligible facility is able to receive RECs and partake in the scheme. RECs can be traded on the spot market or under long term contracts (such as the REC Contracts). In a recent positive development, whereas previously the value of the REC multiplier would be determined at the time of certification, it has now been confirmed that in relation to the 25 October 2024 auction, the REC multipliers that are submitted at bid stage will apply following certification.

3 REC weighting

The weighting values for RECs relating to offshore wind take into account the straight-line distance between the coastline and the central position of the nearest turbine to the coastline and the water depth where the turbine is located. Weightings for offshore wind may potentially reach a maximum of 4.9.Whilst NREC can provide a forecast of the expected REC weights in advance, the final weighting is determined only upon completion of construction and confirmation of REC issuance.

The Guidelines on the Management and Operation of New and Renewable Energy Mandatory Supply and Mandatory Fuel Mix System prescribe a review of the REC weighting every three years.

The Korean Government announced plans to review the REC weighting in the second half of 2024. Results of such review are yet to be publicly announced.

4 System Marginal Price (SMP)

A renewable energy producer can sell the electricity it has produced at the SMP via the wholesale market administered by the Korea Power Exchange (KPX). The SMP is calculated by KPX for each trading hour to meet that hour’s electricity demand and is based on the variable production cost for the marginal supply of power required at the relevant hour that is produced by the most expensive generating unit in the cost based pool. Korea Electric Power Corporation (KEPCO) is the sole purchaser.

5 Corporate PPAs (CPPAs)

CPPAs offer an alternate route to market for generators. Direct wire PPAs, retail / sleeved PPAs and virtual PPAs are permitted in South Korea.

On January 5, 2021, MOTIE announced the introduction of a Korean RE100 system and a revision to the Enforcement Decree of the Electric Utility Act. Under the RE100 campaign, corporates commit to transition to 100 per cent renewable electricity consumption by 2050.

On March 24, 2021, Korea’s National Assembly passed an amendment to the Electric Utility Act that will enable companies to enter into PPAs for electricity generated from renewable energy projects.

The Electric Utility Act amendments allow renewable energy generators to sell electricity directly to end-users without having to go through the Korean Power Exchange.

Electricity consumers who may utilise a CPPA are either general power or industrial power consumers of at least 300kW.

Although power sold under a CPPA will not be eligible for issuance of RECs, the same agency that issues RECs (the Korea Energy Agency) issues “renewable energy use certificates” with respect to such power. These use certificates will include the information currently included in RECs to enable easy tracking of the environmental attribute and to prevent double-counting for purposes of compliance with corporate sustainability goals such as the RE100 initiative.

In light of this, we anticipate the nascent trend towards blended offtake structures in other markets also emerging in South Korea. Click here to find out more about the implementation of these structures.

South Korea: obstacles and challenges

Currently the offshore wind sector in South Korea is facing a variety of challenges ranging from those that are typical of a new industry in a new market, through to challenges conforming traditional Korean regulatory and project financing practices to incorporate international best practice to better facilitate offshore wind project development:

“First-in-country” and technology risk

The relative nascency of the offshore wind sector in South Korea and the significant ambition for floating offshore wind means that South Korea has many “firsts” to traverse in the evolution of its domestic offshore wind industry. The coming years will be key for developing the skill and expertise necessary to deliver offshore projects of this type and size, particularly given the need to facilitate floating offshore wind projects to meet South Korea’s policy targets.

To find out more about the unique challenges inherent in the development of floating offshore wind projects, please click here.

Wind conditions

Unlike Europe, some of South Korea’s coastal areas are typhoon-prone. This creates obvious difficulties for the manufacture and design of turbines. Contractors and research institutes are partnering to develop solutions (e.g. the research project between Doosan Heavy Industries & Construction and the Korea Institute of Energy Technology Evaluation and Planning).

Supply chain and procurement

South Korea generally has high-quality infrastructure but is lacking the required scale of specialist equipment needed for offshore wind projects and more particularly, to support the development of floating offshore wind projects. Installation vessels will need to be built or imported whilst harbour facilities and local manufacturing processes will need to be modified and/or upgraded. These supply chain challenges might be exacerbated given the South Korean REC auction bid evaluation criteria incentivizes local content / component sourcing as well as community benefit and national security.

Furthermore, the government has explicitly identified turbine competitiveness as a relative gap (despite strengths in other components) and has indicated the need for a push for next-generation domestic turbine development and demonstration.

More generally, South Korea is not immune from the supply chain constraints affecting the global offshore wind industry. Among the topics to consider in this context is the anticipated involvement of Chinese Original Equipment Manufacturers (OEMs). This remains a vexed industrial policy question; however, many developers are considering using Chinese OEMs and domestic Korean OEMs having regard to the potentially significant cost and local content benefits, respectively of doing so.

Permitting

Whilst this is not unusual in the region, developers in South Korea have historically been subject to a complex permitting process, which requires coordination across several government authorities. Examples include separate approval procedures administered by a variety of central government ministries including the MOTIE, Korea Electric Power Corp. (KEPCO), Ministry of Environment (MOE), Ministry of Oceans and Fisheries (MOF) and Ministry of Defense (MOD), as well as local government, in order to obtain critical approvals ranging from the electricity business license, grid interconnection agreement, environmental impact assessment, maritime traffic safety assessment, and defense facilities impact operability review & radar impact assessment (RIA).

The introduction of the OSW Promotion Act is intended as an antidote to these challenges, as South Korea shifts from an “open door”, developer-led approach to offshore wind development toward a more centrally planned model, akin to the approach we have seen in European markets such as Denmark and Germany. While these developments bode well for the future, many projects already in development remain subject to the historic permitting track. Moreover, much of the implementing secondary legislation under the OSW Promotion Act legislative framework remains to be passed.

Local community interests

The Government has been keen to promote community involvement in new renewables projects. In addition to maritime spatial planning (MSP) and related maritime traffic safety concerns raised by the marine shipping industry, the commercial fishing industry is often vocal in its opposition to proposed developments due to possible negative effects wind farms may have on marine life and catch rates. Both issues have led to lengthy negotiations, delayed government approvals and rising costs in the past; however, the OSW Promotion Act is expected to simplify this process by establishing pre-approved development sites and fostering improved collaboration with local communities and fisheries.

Grid connection

Like many other grids around the world, the Korean grid has faced increasing pressure in recent years, with many projects struggling to obtain firm, timely and unrestricted grid connection arrangements for their projects. It is pertinent to note that South Korea has curtailment points at both the transmission and distribution levels. Consideration will need to be given to the anticipated timing for connection, and whether a flexible or firm connection is being provided.
Unless a direct wire PPA (or similar alternative offtake arrangement is pursued), developers must enter into a grid connection agreement with KEPCO, who holds the exclusive rights to the transmission, distribution and sale of electricity in South Korea. Renewable projects are not given priority for grid connection and there is potential for delay if several offshore projects seek connection concurrently. As we commonly find internationally, there is little (if any) scope for negotiation of the connection agreement, which has been found to contain certain bankability challenges.

It is also pertinent to note that the offshore wind project is responsible for building out the offshore substation and export cables up to the onshore substation connection point.

The Special Act on the Expansion of the National Power Grid (the “National Power Grid Act”) was enacted in February 2025 to address infrastructure challenges with a specific focus on streamlining and expediting the development of transmission and substation facilities. The law introduces fast-track treatment exclusively for KEPCO developed projects, extends deemed approvals for up to 35 permits and enhances landowner compensation to strengthen local support. The law targets high-voltage (345kV or higher) transmission projects linked to renewable or nuclear energy or strategic industries such as semiconductors. It establishes a Prime Minister–led National Power Grid Committee to oversee approvals. While further details will be set out in the forthcoming Enforcement Decree, the Act is expected to shorten project timelines by up to four years, helping alleviate grid congestion and benefiting major energy consumers.

The government has also signalled that an “energy hub” model may be implemented for offshore wind whereby shared substations would be built near project clusters (on islands or along the coast) to shorten subsea cable routes and reduce overall project costs. Developers would fund the portion of infrastructure used as connection assets, while broader network benefits would be reflected for consumers.

Financing market

South Korea has a deep and liquid, capital cost competitive and mature domestic project finance market. While this in many respects bodes as an advantage for the development of the South Korean offshore wind sector, the role for international lenders and advisers is likely to remain important for a number of reasons.

The international offshore wind financing market exhibits a number of unique structural features that we expect to also become features of the finance packages in the South Korean offshore wind market. For example, South Korean lenders will need to get comfortable with truly non-recourse financing structures as well as with the potential impact of multi-contracting procurement structures without the protection of completion guarantees and financing cost support.

There are also a number of South Korean market specific factors that will also need to be considered from a financing perspective, including the impact of the Resident Participation Scheme, which can be used to improve the debt capacity of a project.

The role of multilaterals (including ECAs) is also a topic to follow closely, including vis-à-vis the participation of South Korean multilaterals in the financings of domestic offshore wind farm financings as well as the availability of the government guarantee programme.

REC weighting and REC auction design

While the auction roadmap released on 8 August 2024, and confirmed upon the announcement of the auction on 25 October 2024, represents a positive step forward from a policy perspective as MOTIE has addressed a number of industry concerns therein, it remains to be seen whether these adjustments will facilitate the expeditious development of offshore wind farm capacity in South Korea.

The ceiling price is the same for both fixed-bottom and floating offshore wind farm projects. It remains to be seen whether this will negatively affect the commerciality of the floating offshore wind projects bidding given the significant cost differences between the two technologies. This means that the REC weighting (which takes into account distance from shore and water depth) will be the primary tool for providing additional support to floating offshore wind projects vis-à-vis their fixed-bottom cousins. The impending changes to the REC weighting methodology will also be interesting to consider in this respect, given there are a myriad of factors that go beyond distance from shore and water depth that disproportionately affect the development of floating offshore wind projects (such as the heightened costs of addressing maritime safety related considerations).

Issues have also arisen with the terms of the REC Contracts themselves, as offshore wind developers have had to grapple with the absence of a hardwired, backstop PPA mechanism in the event of REC Contract termination, as well as with the allocation of risks associated with curtailment, change-in-law and force majeure.

Under the previous framework, a replacement contract regime existed (pursuant to which the relevant authorities would try to identify a replacement offtaker), but it was narrower in scope, was triggered in more limited circumstances and did not allow generators to request replacement arrangements directly.

In this regard, pursuant to the amendments to the Rules on Issuance and Trading Market Operation of Renewable Energy Certificates which came into effect on 20 August 2025, certain improvements have been introduced to the replacement contract framework, including expanding the scope of eligible circumstances (such as purchaser default or contract failure) and allowing generators to request replacement arrangements in specified cases.

Country overview

  • content-type:insights/publication
  • nrf-migrated:article-categories/international-offshore-wind/international-offshore-wind

Footnotes

  1. 1

    https://ieefa.org/sites/default/files/2024-09/IEEFA%20Report%20-%20South%20Korea%E2%80%99s%20Economy%20Risks%20Missing%20Out%20on%20Global%20Transition%20to%20Renewables.pdf

card-grid-item, aem-sourced
Global offshore wind: Key markets and prospects
/content/nrf-eds/en-au/insights/publications/global-offshore-wind-key-markets-and-prospects

Contact