This article was written in collaboration with Partner, Vu Le Trung and Associate, Vu Ha Anh of VILAF.
Circular 62
The revised Power Development Plan VIII (which was approved by the Prime Minister via Decision No. 768/QD-TTg) targets between 10,000 MW and 16,300 MW of Battery Energy Storage Systems (BESS) capacity by 2030. This increase reflects Vietnam’s commitment to integrating more renewable energy sources into its grid.
Circular 62/2025/TT-BCT (Circular 62) - which takes effect from 26 January 2026 – establishes the first standardized framework mechanism for pricing power supplied by large scale BESS in Vietnam. It is aimed at creating a robust and transparent pricing policy that aims to attract and support strategic investment in BESS.
We take a look at some of the key features of Circular 62 in this note.
Electricity generation price bracket for BESS systems
The electricity generation price bracket in relation to the BESS system has a range between the minimum price (0 VND/kWh) and the maximum electricity generation price. By way of background, the electricity generation price bracket (khung giá phát điện) is the regulated minimum–maximum price range within which electricity generators and Vietnam Electricity (EVN) are allowed to negotiate and sign power purchase agreements. This acts as a pricing cap framework to ensure that prices remain cost reflective while controlling system-wide electricity costs.
The maximum electricity generation price for a BESS system (VND/kWh) is the sum of the following three constituents:
- The average fixed price
- The variable price; and
- The fixed operation and maintenance price
We discuss below how each of these three components would be calculated for a BESS system.
Average fixed price
The average fixed price (VND/kWh) is determined in accordance with Article 5 of Circular 62. This is the product of the cost of construction investment capital (excluding VAT) calculated on an annual basis divided by average electricity delivered and received over the life of the BESS system.
Cost of construction investment capital (excluding VAT) calculated on an annual basis
Circular 62 provides that the total cost of construction investment capital would be determined in accordance with relevant laws and in accordance with construction investment feasibility report. The design of the BESS system would also be relevant in this regard. In practice, the project developer would need to prepare a feasibility study and cost estimate in accordance with the Law on Construction, Law on Investment, and relevant technical standards. The cost of construction investment capital would be calculated based on this feasibility study. The cost of construction would be agreed at the time of negotiation of electricity generation service prices and would include all expenses for which the project developer will be responsible up to the interconnection point of the BESS system.
Once the aggregate cost of construction investment capital is known, then the annual amount is determined. In order to make this determination, a few key inputs are required:
- The investment rate, which is the cost of bringing online 1 kW of storage capacity at the time of making the calculation of the electricity generation price bracket for the BESS system. This investment rate is arrived at based on the feasibility report submitted in relation to the BESS system or, if not, then using other reference data. The investment rate takes into account the foreign currency exchange rate;
- The installed capacity of the BESS system which would be aligned with the implementation and national electricity development plans;
- The economic life of the BESS system which would be 15 years as per Annex I of Circular 62; and
- A financial discount rate, which is the pre-tax nominal weighted average cost of the capital (debt and equity) required for the BESS system. In relation to the cost of debt, the formula uses the average SOFR over the prior 36-month period plus a 3% loan arrangement fee (for foreign currency loans) and average interest rates on deposits in Vietnam over the prior 60-month period plus a 3% loan arrangement fee (for local currency loans). Note that in calculating the financial discount rate, the after-tax profit margin on the project developer’s contributed capital is capped at 12%.
Average electricity delivered and received over the life of the project
The average electricity is calculated across the economic life of the BESS project and takes into account the following features:
- The installed capacity of the BESS system;
- The total number of hours of discharge in one cycle of the BESS system (this is prescribed as being 2 hours under Circular 62);
- The number of discharge cycles of the BESS system throughout its economic life, which as per Circular 62 should be at least 8,000;
- The capacity loss rate of the BESS system, which is calculated on an average annual basis for the entire economic life of the BESS system and which is prescribed to be 2% under Circular 62;
- The charge-discharge cycle efficiency of the BESS system which is prescribed under Circular 62 to be 85%.The calculation also takes into account the rate at which electricity that is self-consumed by the BESS system and rate at which power is lost during transmission (this is determined on the basis of a review of the feasibility reports and technical documents supplied by the equipment manufacturers) and the economic life cycle of the plant which is prescribed under Circular 62 to be 15 years.
Variable price
The variable price (VND/kWh) is the cost component relating to the cost of charging the BESS system. This is determined according to the method specified in Article 6 of Circular 62 and takes into account:
- The charge-discharge cycle efficiency of the BESS system which is prescribed under Circular 62 to be 85%;
- The rate at which electricity is self-consumed by the BESS system and the rate of loss of power during transmission (this is the same calculation as is done to determine the average electricity delivered and received over the life of the project); and
- The retail price of electricity during off-peak hours which applies to manufacturing industries. This relates to Decision No. 1279/QD BCT, issued on 9 May 2025 by the Ministry of Industry and Trade which sets out the electricity selling prices for various customer groups—including manufacturing industries—and specifies unit prices for off-peak hours during retail electricity pricing. As per Decision No. 1279/QD BCT, the off-peak prices are as follows:
| Voltage Level | Off-Peak Price (VND/kWh) |
| ≥ 110 kV | 1,146 |
| 22 kV – < 110 kV | 1,190 |
| 6 kV – < 22 kV | 1,234 |
| < 6 kV | 1,300 |
Fixed operation and maintenance price
The fixed operation and maintenance price (VND/kWh) is a component for recovering major repair costs, labour and other annual costs. This is determined according to the method specified in Article 7 of Circular 62.
The starting point for this component is to calculate the investment rate, i.e. the cost of bringing online 1 kW of storage capacity at the time of making the calculation of the electricity generation price bracket for the BESS system, and then to determine the proportion of fixed operating and maintenance costs in this investment rate. This is determined on the basis of the feasibility report or by reference to the data provided external consultants. This can then be multiplied by the abovementioned investment rate and the installed capacity of the BESS system to determine the total cost of operation and maintenance across the life of the BESS system and then divided by average electricity calculated across the economic life of the project (i.e. 15 years under Circular 62) (as would be done to determine the average fixed price).
The fixed operation and maintenance price of the BESS system for each year of the economic life of the project would be adjusted to take into account the cost components of operation and maintenance prices based on major repair costs and other costs (the mechanism of agreeing these incremental costs would be subject to discussion between the project developer and offtaker in the power purchase agreement and includes costs that may need to be borne in foreign currency). As well, the adjustment to the fixed operation and maintenance price would take into account inflation (which would be adjust in accordance with the CPI index announced by the national statistical agency in Vietnam but must not exceed 2.5% per year) as well as a change in the foreign exchange in relation to repayment of foreign currency debt incurred in relation to the project.
Guidelines for determining the electricity generation service prices
Pursuant to Article 10 of Circular 62, the electricity generation service price of the BESS system would be determined on the basis of reasonable and valid expenses of the project developer over the entire economic life of the project, however that the project developer’s internal rate of return (IRR) cannot exceed 12%.
The calculation of the electricity generation service price for a BESS system would use the electricity generation price bracket for the relevant base year that is established by the Ministry of Industry and Trade as the baseline. The base year is the year in which the total investment is approved to be used for calculating the electricity generation service price of the BESS system. If there is no electricity generation price bracket available for the relevant base year, the electricity generation service price is calculated by converting the corresponding cost components to compare with the nearest electricity generation price bracket after the base year.
Articles 11, 12 and 13 of Circular 62 set out the mechanics for calculating the electricity generation service price for the relevant base year. This electricity generation service price (for the base year) aggregates the capacity price for the BESS system (which includes the average fixed price and the fixed operation and maintenance price) and the electricity price calculated according to the cost of purchasing electricity. Electricity generation service prices do not include value-added tax and other taxes, fees and other cash revenues prescribed by the relevant state management agencies (except for taxes and fees that are already calculated in the electricity generation service price plan).
Power purchase agreement for BESS projects
The form of the power purchase agreement is specified in Circular 62 and forms the basis of negotiations for the project developer and offtaker. The project developer and the offtaker have the right to agree to supplement the terms specified in the power purchase agreement in accordance with the laws of Vietnam.
The language of the power purchase agreement would be Vietnamese. In case the project developer is a foreign investor, the project developer and the offtaker may agree to use English as the language of the contract.
The project developer and the offtaker are required to determine the average fixed price applicable to a year (as discussed above) in order to calculate the final electricity generation price throughout the term of the power purchase agreement. Nonetheless, Article 14 allows the project developer and the offtaker to change the applicable average fixed price into a fixed price applicable for each year of the term of the power purchase agreement (on the basis of the actual loan conditions and financial capability).
If the project developer and the offtaker agree to apply a fixed price for the average fixed price for each year of the term of the power purchase agreement, then the parties must bear in mind that:
- the average fixed price should not vary from what is agreed between the project developer and the offtaker;
- the financial discount rate when calculating the fixed price for each year (agreed upon by the project developer and the offtaker) must be equal to the IRR of the BESS system; and
- the project developer must repay the loans incurred in relation to the construction of the project in accordance with the loan repayment term.
Responsibilities of National Power System and Market Operator (NSMO)
Article 20 of Circular 62 makes NSMO responsible for calculating and determining the BESS capacity to be installed in each region which areas take priority. NSMO would report this to the Ministry of Industry and Trade which would consider necessary changes to the implementation of the National Electricity Development Plan.
At the operational level, NSMO would plan and schedule the dispatch of the BESS systems and determine the operation plan, charging, discharging etc. with a view to effectively address the grid load situation and balance. NSMO would coordinate with the project developer and the offtaker to improve the quality of the national power system.