This article was written in collaboration with Partner, Vu Le Trung and Supervising Associate, Vu Ha Anh of VILAF

Decree 243

On 26 June 2026, the Government of Vietnam promulgated Decree 243/2026/ND-CP (Decree 243) with immediate effect. It amends and supplements certain provisions of Decree No. 57/2025/ND-CP (Decree 57), which had come into effect in March 2025 and set out regulations on the mechanism for direct electricity purchase and sale between renewable energy power generation units and large electricity users in Vietnam.

Decree 243 demonstrates Vietnam’s shift from a framework built primarily around utility-scale renewable projects towards one that expressly accommodates distributed-generation business models. It also supports three key sectors that are expected to drive future electricity demand growth: industrial parks and manufacturing clusters; data centres and digital infrastructure; and electric vehicle (EV) charging infrastructure.

In this note we discuss certain key changes to Decree 57 brought about by Decree 243.

Expanded scope of regulated entities

The list of entities that are permitted to sell and purchase power through private connection grids has been expanded under Decree 243 to include electricity retailers that operate within “zone and cluster models” such as industrial parks, technology parks, economic zones etc. (but excluding urban areas and free-trade zones). This is in line with the Law on Electricity 2024 and Resolution 253/2025/QH15 of the National Assembly on national energy development mechanisms and policies for the 2026-2030 period (Resolution 253/2025).

Previously, the scope of Decree 57 was limited to transactions between renewable energy generation companies and qualifying large consumers only. However, factories inside industrial parks often do not directly contract with electricity generators as the power sale was managed through an electricity retailer. This made negotiating a private wire direct power purchase agreement (DPPA) under Decree 57 difficult. Decree 243 addresses this by bringing electricity retailers within the regulatory framework for DPPAs and enables an “aggregation model” under which a renewable energy developer may sell power to a single licensed industrial-park electricity retailer, which in turn can distribute the electricity to multiple tenants inside that industrial park. This significantly improves scalability and can facilitate zone/cluster wide renewable energy procurement.

Electricity retailers and renewable energy generators to which Decree 243 applies are required to invest in metering equipment and data collection, monitoring and control systems. Some rooftop solar projects are required to operate on a “zero-export” basis, which means that electricity cannot be exported to the grid. Such projects are required to install devices to ensure that electricity generated is consumed locally and does not flow into the national grid in breach of regulatory requirements. “Zero export” may arise in scenarios where a project is intended for self-consumption or where grid constraints limit the ability to inject electricity into the distribution network.

In addition to the electricity retailers that operate within zone and cluster models, the list of entities involved in direct sale and purchase of power through the national grid has been expanded by Decree 243 to include data centre operators and large electricity consumers using electricity for EV charging stations, charging points, and battery-swapping stations for the purpose of providing commercial charging services for EVs connected at a voltage level of 22 kV or above. With this change, data centres and EV charging infrastructure are expressly permitted to procure renewable power under the DPPA framework.

Expanded scope of “rooftop solar power” and “renewable energy generation units”

Under Decree 57, the scope of what constituted “rooftop solar power” was limited to electricity produced from solar panels installed on the “roofs of construction works” and connected with electrical devices for electricity generation. The definition has been expanded under Decree 243 to include electricity generated from photovoltaic panels “installed on the roof of a building or a structure having a building-like form, connected to electrical equipment and used for electricity generation activities”. This appears to extend the concept beyond conventional construction works to include non-traditional structures that resemble buildings in form and function, e.g. warehouses, logistics facilities, industrial canopies, covered parking areas, agricultural structures or other roofed facilities that may not have previously fallen squarely within the definition of “rooftop solar power”.

Decree 243 also modifies the Decree 57 terminology in relation to “renewable energy generation units” to include electricity units possessing renewable energy sources prescribed under the Law on Electricity 2024 (such as solar energy, wind energy or geothermal energy), rather than only renewable energy power plants. This takes the focus away from the type of renewable asset and focuses instead on generator participating in the DPPA regime. While this may not impact utility-scale wind and solar projects, it helps accommodate non-traditional renewable assets or distributed generation assets (e.g. rooftop solar installations spread across multiple factory roofs that operate as a distributed generation portfolio rather than as a single, identifiable power plant) which may not have clearly been caught within the definition of “renewable energy generation unit” under Decree 57.

A renewable energy generator that invests in and installs rooftop solar power for the direct sale of electricity to a large electricity consumer is not required to carry out the registration procedures for the development of rooftop solar power sources.

“Private connection grids”

Decree 243 revises the definition of “private connection grid” under Decree 57 to mean an electricity grid that is “invested in, installed, constructed and operated for the direct sale of electricity to large electricity consumers or electricity retailers operating within zone and cluster models”.

This change broadens the concept beyond a private connection arrangement between a renewable energy generator and a large electricity consumer. In addition to accommodating electricity retailers operating within designated zones and clusters as eligible purchasers, the amendment adopts a more functional definition focused on infrastructure used for direct electricity sales and expressly confirms that connection lines linking rooftop solar installations to a purchaser's electricity receipt point fall within the scope of a private connection grid. This removes any uncertainty as to whether a rooftop solar installation supplying a customer via a dedicated line qualifies as a private connection grid. This is particularly relevant for captive solar projects within industrial parks or behind-the-meter renewable energy contracts.

Direct power trading and sale of surplus electricity

Decree 243 permits the electricity price under a DPPA to be negotiated and agreed between the electricity seller and the electricity purchaser, replacing the pricing mechanism stipulated in Decree 57, under which a DPPA was limited by the maximum price of the electricity generation bracket of the corresponding electricity source type. In doing so, Decree 243 implements Resolution 253/2025.

Another significant change from Decree 57 that Decree 243 introduces is in the amount of surplus electricity that may be sold to Electricity Corporations or Electricity Companies1 and the categories of sellers that can benefit from such sale of surplus electricity. Under Decree 57, the sale of surplus electricity was available for rooftop solar power projects only, and the amount of surplus electricity that could be sold was limited to 20%. Under Decree 243, surplus electricity generated by any renewable energy generator or by an electricity retailer operating within a zone or cluster model (where the electricity retailer has invested in rooftop solar power to supply large electricity consumers through a private connection grid) is eligible to be sold, and the cap on such sale has been increased to 50%. The scope of what constitutes "surplus electricity" includes electricity generated from an electricity storage system, which gives BESS a greater recognition under the amended framework.

The purchase price for such surplus electricity will be the average electricity market price of the immediately preceding year as published by the Electricity System and Market Operator, but must not exceed the maximum price under the applicable tariff framework for ground-mounted solar power generation. This means that although renewable energy generators are able to sell a greater share of surplus electricity into the grid, the purchase price for such surplus remains regulated. Nonetheless, if a renewable energy generator develops a rooftop solar power source to supply electricity directly to a large electricity consumer located within a zone or cluster model, and sells surplus electricity to an electricity retailer operating within such zone or cluster model (which, as noted above, is now within the scope of the DPPA regime), the quantity and price of such surplus electricity can be negotiated and agreed between the parties. There is greater flexibility in this scenario for both volume and price which did not exist previously under Decree 57. This is a key development, since instead of being exported to the national grid under a regulated pricing regime, surplus electricity can now be retained within an industrial park ecosystem and sold to a local electricity retailer, creating opportunities for more efficient energy management and improved value realisation.

Renewable energy developers selling power into the Vietnam wholesale electricity market

Decree 57 enables renewable energy developers to sell power into the wholesale electricity market via power purchase agreements entered into with Vietnam Electricity (EVN). The main contents of the power purchase agreement are specified in Appendix 1 to Decree 57 but can be supplemented by EVN and the renewable energy developer to clarify responsibilities and entitlements of the parties so long as these are in compliance with Decree 57 and other relevant laws.

Sale by renewable energy developers into the wholesale market must comply with the regulations of the Ministry of Industry and Trade (MOIT). Renewable energy developers are required to forecast the generation capacity of their power plants for each trading period of the coming day. The National Electricity System and Market Operation Company Limited (NSMO) shall, based on the quotations for the coming day and/or the coming trading period, carry out a comparison of the value of the forecasted generation capacity and prepare a dispatch schedule for the renewable energy developers participating in the competitive wholesale electricity market. Such activity would be in accordance with the MOIT regulations and other relevant laws. The NSMO is also required to formulate and issue billing statements for renewable energy developers.

The spot price is the full market price (denominated as VND/kWh), determined in each trading period of the spot electricity market. It is the aggregate of:

  • the market price; and
  • capacity-add-on price according to the regulations on competitive wholesale electricity market operations set out by the MOIT.

The total amount payable to a renewable energy developer for a billing period is the aggregate of the product of the measured electricity of renewable energy generation units in each trading period in such billing period and the spot price for such trading period.

Large electricity consumers purchasing electricity from Electricity Corporations and Electricity Companies under Decree 57

Under Section 2, Chapter 3 of Decree 57, large electricity consumers and (following the enactment of Decree 243) electricity retailers operating within a zone or cluster model (excluding urban areas and free-trade zones) that have power purchase agreements with renewable energy developers may purchase electricity from Electricity Corporations (or authorized or decentralized units) or Electricity Companies.

Decree 57 enables large electricity consumers and (following the enactment of Decree 243/2026) electricity retailers to enter into power purchase agreements with Electricity Corporations and Electricity Companies. The main contents of the power purchase agreement are specified in Appendix 2 to Decree 57 but can be supplemented to clarify responsibilities and entitlements of the parties so long as these are in compliance with Decree 57 and other relevant laws.

The cost payable by large electricity consumers or electricity retailers (as applicable) to Electricity Corporations or Electricity Companies in such scenarios depends on whether their electricity consumption in a trading period is higher or lower than the electricity generated and distributed by renewable developers to such electricity consumers or electricity retailers:

  • If such electricity consumption is lower than the electricity generated and distributed, then the cost payable is based on the spot price applicable to electricity wholesale buyers and the cost of the use of electricity system services (including electricity transmission and distribution) and the cost of offsetting differences as per Appendix IV of Decree 57.

  • If such electricity consumption is higher than the electricity generated and distributed, then:

    • the cost payable for the portion of electricity that does not exceed the renewable energy generated by the renewable energy developer will be in accordance with the mechanism set out in the immediately preceding paragraph; and
    • the cost payable for the excess electricity will be as per applicable retail tariff (in the case of a large electricity consumer) or applicable wholesale tariff (and in the case of an electricity retailer).

This mechanism creates a structure under which a consumer receives the economic benefit of renewable electricity only to the extent that the renewable energy generator actually produces electricity, with any shortfall in supply being met by electricity supplied through the national grid. As a result, the consumer bears the risk that, if renewable generation is lower than expected i.e. due to intermittency, part of its electricity consumption may be priced at grid tariffs rather than under the DPPA.

Forward power purchase agreements between large electricity consumers (or authorized electricity retailers in clusters and zones) and renewable energy developers

Article 17 of Decree 57 (as amended by Decree 243/2026) sets out the mechanics of forward power purchase agreements (i.e. virtual PPAs), under which renewable energy generators and large electricity consumers (or electricy retailers operating within industrial parks and clusters) may negotiate and enter into forward power purchase agreements based on the key terms set out in Appendix III of Decree 57 and other contractual matters as agreed by the parties (e.g. a guarantee for payments to be made by the offtaker, security deposits etc.).

The reference price under the forward power purchase agreement would be the agreed price set out therein, whereas the spot price will be that which is published by the NSMO. The difference between the reference price and the spot price will determine the payout under the forward power purchase agreement as well as to whom the amount is payable. The parties can commercially agree on the reference price under the forward power purchase agreement as well as the volume of electricity.

Decree 243 incoporate a new Article 17(5) into Decree 57, which effectively creates a new aggregated offtake model for industrial parks and clusters. Instead of signing separate DPPAs with different renewable energy developers, a renewable energy developer can potentially contract with a single retailer within an industrial park (which would then allocate renewable electricity among tenants). Such allocation must, however, ensure that the aggregate electricity allocated to the relevant tenants does not exceed the quantity of electricity agreed to be supplied by the renewable energy developer to the electricity retailer under the relevant forward power purchase agreement.

Regulatory framework for electricity retailers

Decree 243 introduces a comprehensive regulatory framework for electricity retailers operating within zone and cluster models, reflecting their expanded role under Decree 243 as facilitators, intermediaries and, in some cases, suppliers of renewable electricity. Electricity retailers are required to facilitate participation in the DPPA regime by large electricity consumers and renewable energy generators within their managed areas, comply with electricity system operation and metering regulations, and oversee the safe and compliant implementation of DPPA arrangements. They must also amend their existing power purchase arrangements with the relevant Electricity Corporation or Electricity Company to accommodate direct renewable energy purchases by customers within the zone or cluster. Where a large electricity consumer elects to procure electricity directly from a renewable energy generator through a private connection grid, the retailer must promptly agree amendments to existing supply arrangements, determine network usage charges and coordinate the connection of the renewable energy source. In addition, retailers that purchase electricity from renewable energy generators must allocate such renewable electricity to participating consumers and ensure that allocated volumes do not exceed purchased volumes.

Where an electricity retailer itself invests in renewable generation and supplies electricity to large consumers through a private connection grid, it assumes the obligations of a renewable energy generator under Decree 243.

Overall, Decree 243 positions electricity retailers as key enablers of renewable energy procurement within industrial parks, economic zones and other designated clusters, while imposing responsibilities aimed at ensuring system reliability, regulatory compliance and transparent allocation of renewable electricity.

Norton Rose Fulbright is not licensed to practice Vietnam law and does not provide advice on Vietnam law matters. Any comments or analysis provided herein are for general informational purposes only and should not be construed as legal advice under Vietnam law. For formal advice on Vietnamese legal issues, please consult a qualified Vietnam law firm or practitioner

Footnotes

  1. 1

    The EVN distribution/retail utilities that supplies electricity to the consumer through the national grid and handles metering, billing and settlement functions for any DPPA arrangement.

Contact