Publication
This year’s Africa Energy Forum presents a unique opportunity for African collaboration
In the rural village of Gwanda, Zimbabwe, a mother walks several kilometres each day to find firewood so she can cook for her children.
United Kingdom | Publication | June 2024
There is a legal requirement for trustees of DC schemes to prepare an annual governance statement, signed by the chair of trustees, within seven months of the end of each scheme year. This is referred to as the "chair's statement". In Caldwell (Trustee of the Smith & Wallace & Co 1988 Pension Plan) v Pensions Regulator [2024] the First-tier Tribunal dismissed an appeal by a trustee of a DC scheme against the imposition of a Regulator’s penalty notice for failing to prepare a chair's statement.
The Regulator submitted that it had no option but to issue a penalty notice in relation to a failure since the use of the word "must" in the relevant legislation allowed no discretion, no matter how compelling the circumstances.
The tribunal did not accept that the "mere use of mandatory language … excludes from consideration any explanation offered for the breach, however compelling". It considered that Parliament's intention was that a penalty should ordinarily follow a breach, but that the Regulator should refrain from penalising trustees where "wholly exceptional circumstances fully explained and excused their non-compliance and imposition of a penalty would be manifestly unjust".
However, the tribunal accepted that in this case the trustee had failed to present valid mitigating circumstances and therefore the Regulator was obliged to impose the penalty notice. There was also no basis on which the Regulator could properly have revoked the penalty notice under appeal.
Publication
In the rural village of Gwanda, Zimbabwe, a mother walks several kilometres each day to find firewood so she can cook for her children.
Publication
Southern Africa is a key focus of attention at the present time, as it faces a perfect storm of an energy emergency due to hydropower generation being severely impacted by reduced water levels due to droughts whilst the demand of its regional miners for clean baseload power rapidly accelerates.
Subscribe and stay up to date with the latest legal news, information and events . . .
© Norton Rose Fulbright LLP 2025