
Publication
International Restructuring Newswire
Welcome to the Q3 2025 edition of the Norton Rose Fulbright International Restructuring Newswire.
United Kingdom | Publication | February 2024
The general submission deadline for taking action to minimise the 2024/25 PPF levy is midnight on March 31, 2024. Schemes should note that this is Easter Sunday and the Friday before is a bank holiday, meaning action will need to be taken in advance of the deadline.
This includes the submission of scheme returns and electronic contingent asset certificates to the Regulator, and of asset backed contribution certificates and special category employer applications to the PPF.
Supporting documents for contingent assets must be emailed to the PPF before 5pm on April 2, 2024.
To be reflected in the scheme levy, deficit reduction contributions must have been certified on the Regulator's Exchange system by 5pm on April 30, 2024.
Full block transfers should be certified with the Regulator before 5pm on June 30, 2024.
The full list of deadlines is available on the PPF website.
Publication
Welcome to the Q3 2025 edition of the Norton Rose Fulbright International Restructuring Newswire.
Publication
Canada is well-positioned to be a leader in Carbon Capture and Storage (“CCS”).
Publication
Hydrogen has long been of interest as a low emission or emission-free energy source. For Canada, its use, production, and transportation loom as a new energy disruptor. As a fuel, hydrogen is a clean power source that when combusted, produces no carbon dioxide emissions, only water vapour. Some methods used to produce hydrogen do, however, generate emissions.
Subscribe and stay up to date with the latest legal news, information and events . . .
© Norton Rose Fulbright LLP 2025